Personal tools
Document Actions

Deliverables

Deliv. No Deliverable title WP No Lead participant Nature Dissemination Deliv. date
D1.1-2 IST-robot concepts and preliminary integration 1 CNRS R PU M6
D1.3 Joint usability, user experience, human science and societal impact methods plan 1 PLUS R PU M6
D1.4 Industry/scenarios guidelines and preliminary specifications 1 Dragados R PU M6
D2.1 Human/IST-robotic systems interaction design model 2 PLUS R PU M22
D2.2-3 Architectures and models of IST-robotics: different interactions models of collaborative work in different real environments 2 CNRS
R PU M22
D2.4 Teleoperator interaction design concept 2 SAS R RE M22
D2.5-6 Participant’s intention in human-robot collaborative tasks 2 CNRS R PU M30
D2.7 Multi-site, IST-robots teleoperation2 TUM R RE M30
D2.8-9 Final report on IST-robotic architectures and models in CWE
2 UC3M R PU M36
D2.10 Report on guidelines for future IST-robotic research 2 CNRS R PU M36
D3.1-2 Interface design prototype - IST-robot / CWE integration through virtualized/mixed environments interfacing 3 EPFL R PU M22
D3.3 Design support software for ROBOT@CWE 3 HP-EIC R PU M22
D3.4-7 Preliminary report on usability, social acceptance, user experience and societal impact evaluation3 PLUS R PU M30
D3.8 Final report on software concepts for ROBOT@CWE3 HP-EIC R RE M36
D4.1-3 Final report on ROBOT@CWE demonstrators
4 CNRS P+R PU M36
D4.4-5 Exploitation plan and report on illustrative space building and construction site mock-up demonstrations
4 SAS P+R RE M36
D4.6 User evaluation report 4 PLUS R PU M36
D4.7 Movie: futuristic view on ROBOT@CWE 4 CNRS O PU M36
D5.1 Consortium agreement finalized during negotiation phase before the start of project 5 CNRS R CO M0
D5.2 Organisation of kick-off meeting in Paris, France 5 CNRS R PU M1
D5.3 Setup of the communication infrastructure (web-server, mailing list, net-meeting, etc.)5 CNRS R CO M2
D5.4 Organization of the screening phase WP meeting. Location decision, preparation of agenda and minutes 5 CNRS R PU M5
D5.5 Organisation of the 1st regular meeting of the management board. Location decision, preparation of agenda and minutes 5 CNRS R PU M11
D5.6 Annual progress reports No 1 covering periods 5 CNRS R PU M13
D5.7 Annual progress reports No 2 covering periods 5 CNRS R CO M25
D5.8 Annual progress reports No 3 covering periods 5 CNRS R CO M36
D5.9 Final report and final workshop organization. Location, preparation of agenda and minutes
5 CNRS R PU M36

Powered by Plone CMS, the Open Source Content Management System
About this portal